
This worksheet is a sound-and-interruption survey for the proposed interview setting. It does not provide equipment settings or authorise changes to building systems or site work.
Listen at a relevant time
Ask what the room is normally like during the proposed filming window. A quiet visit at another time may not reveal deliveries, announcements, neighbouring work or regular conversations that overlap the interview period.
Describe what is heard and when. “An announcement is made at intervals” is more useful than “the room is bad for sound”. Note whether the information was observed directly, supplied by a building contact or assumed from past experience.
Do not record private conversations as evidence of a noise problem. A plain description will often be enough to start the discussion. If production requests a reference recording, confirm an appropriate, authorised way to provide it without capturing unnecessary personal or confidential information.
Separate predictable activity from uncertainty
Some interruptions have known windows; others cannot be reliably timed. Record the distinction. A plan that relies on a predictable pause needs confirmation from the responsible person, while an unpredictable condition may require a different setting or approach.
Avoid asking staff to switch off equipment, stop work or change operating processes yourself. The relevant building or site contact decides what can appropriately be changed, and production assesses whether the resulting arrangement suits the interview.
Similarly, do not assume an editor can remove every unwanted sound later. Ask the production team what information they need and what limitations remain after assessment. A post-production possibility should not be treated as a guarantee that the original setting is suitable.
Prepare an alternative, not a shopping list
Identify another available room or time for discussion, including its access owner and normal use. Do not present a quieter-looking alternative as already approved; it may have its own constraints.
Explain what moving the interview would change for the story. If the project background is important, production may consider supporting footage separately. If the speaker needs to demonstrate a physical relationship, the alternative may require a different explanation.
Buying an extra piece of equipment is not a buyer-side substitute for that assessment. Keep the request focused on clear recorded speech and the intended story, leaving the technical approach to the production team.
Copy the sound survey
| Observation | What to record |
|---|---|
| Proposed room/window | Exact place and relevant time |
| Sound source or interruption | Plain-language description |
| Pattern | Continuous, intermittent, scheduled or unknown |
| Evidence | Observed when, or confirmed by whom |
| Operational owner | Person who can explain the activity |
| Changes proposed | Only for authorised assessment |
| Alternative room/time | Availability and contact, not assumed suitability |
| Story consequence | What moving the interview would change |
| Production response | Assessment, further test or revised proposal |
Keep the distinction between “known” and “to confirm” visible. An unknown does not make a room unusable, but it does mean the plan should not depend on an unsupported assumption.
A fictional interview-room assessment
A fictional project team proposes a room beside a loading area. It seems quiet during an initial visit, but the building contact explains that deliveries usually coincide with the proposed interview window.
The buyer records that information and identifies another room for production to assess. They do not promise to halt deliveries or tell the editor that any noise can be fixed later. The final choice depends on the relevant contacts' assessment and the agreed scope. This example is invented and does not describe a Live Images production.
Confirm the decision before briefing the speaker
Once the setting is agreed, tell the participant where to attend and which contact handles any change. If a noise-related assumption changes, notify production before treating the original arrangement as settled.
Live Images' Industry Standard includes sound finishing within its described project-film scope, but that does not establish that every recording problem can be repaired. Bring the survey to the planning conversation. Use the filming-day coordination sheet for the final location and contacts, keeping the technical assessment with the production team.
Sources and editorial note
Live Images — Industry Standard, checked 29 October 2026, supports the limited description of the current project-film service and agreed scope.
The worksheet and fictional example are original planning guidance. Confirm project facts, responsibilities and any proposed production changes with the appropriate people and the written scope. Prepared with AI assistance for Live Images.